How long does it take to build a website?
A landing page can be live in two weeks, and extra languages usually add about a week. What decides the timeline, a realistic week-by-week plan, and the things that cause most delays.
On this page07
“How long will it take?” is usually the second question after “what will it cost?”. The honest answer is a range, but it is a range you can narrow quickly once you know what decides it.
Typical website timelines
| Project | Typical timeline | What it usually includes |
|---|---|---|
| Landing page | About 2 weeks | One page built around one offer and one action |
| Marketing website | 2 to 6 weeks | Home, services, about, work, contact, blog |
| Online store | 4 to 10 weeks | Products, collections, checkout, payments, shipping |
| Extra languages | About 1 week more | Each language added and checked, plus the time your team needs to review it |
| Redesign | Similar to a new site | Plus moving content and keeping SEO intact |
These are for a focused team with content arriving on time. They stretch when decisions and content don’t.
What decides how long a website takes?
- Page types, not page count. Fifty project pages built from one template are faster than ten pages that are all different.
- Languages. Extra languages usually add about a week, and then as long as your team needs to check them. Each needs its own content, checks and, for Arabic, right-to-left layouts. See bilingual websites.
- Integrations: booking systems, CRMs, payment, property listings, maps.
- Content. Who writes the copy, and who supplies photos and video.
- Feedback. How many people approve each stage, and how fast.
- The platform. Some are faster to launch, some to customise. See choosing a website platform.
A realistic week-by-week plan
For a typical marketing website, our process looks like this:
- Week 1, structure. The pages, what each one has to answer and the action it leads to. Copy starts here, because design should follow the content, not the other way round.
- Weeks 2 to 3, design. Key pages designed for phone and desktop, with motion. One round of feedback on the direction, one on the details.
- Weeks 4 to 6, build. Development, CMS, SEO, AI search, analytics and tracking.
- Launch. Tested on real devices, redirects in place, launched, and measured from the first visit.
What delays website projects most?
In our experience it is rarely the design or the code. It is usually:
- Waiting for content. Copy, photos and product details that arrive late hold up every stage after them.
- Too many approvers. Five people giving feedback separately turns one round into five.
- Changing the brief mid-way. New pages and features after the design is approved restart part of the work.
- Third parties: a booking system, a hosting login or a domain nobody can access.
How can you launch faster?
- Decide who approves, and give one person the final say.
- Let the agency write the copy, or have yours ready before design starts.
- Launch the core first. Home, services, contact and the pages that sell. Add the blog, extra case studies and secondary pages after launch.
- Use what you have. Good existing photos beat waiting weeks for a shoot; replace them later.
Don’t forget the redesign risks
If you are replacing an existing site, plan for SEO: keep URLs where you can, redirect the ones that change, and carry over titles, descriptions and content that ranks. A beautiful new site that loses its Google traffic on launch day is not an upgrade. Our guides to local SEO and AEO cover what the new site should do better.
Most websites aren’t slow to build. They’re slow to decide.
We design and build websites in Astro and Framer, with Shopify for online stores, usually live in two to six weeks. You get a timeline with the quote, and our process explains every step. Book a call to get yours.
Questions people ask
Can a website be built in one week?
A simple landing page or one-page site can be, if the content is ready and decisions are quick. A full website with several page types, copy, SEO and tracking usually needs at least a few weeks to be done properly.
How long does a website redesign take?
About as long as a new site of the same size, plus time to move content and set up redirects so you keep your search rankings. For most marketing sites that is two to six weeks.
What do I need to prepare before a website project?
Your goals for the site, who it is for, examples of sites you like, your brand files, any existing content and photos, access to your domain and hosting, and one person who can approve decisions.
Does adding Arabic make a website take longer?
Yes, usually by about a week, plus the time your team needs to check the translations. Arabic needs its own content and translation checks, and right-to-left layouts need to be designed and tested. Planning both languages from the start is faster than adding Arabic later.